Fun interruption
October 20, 2009 by Sandy
Filed under My RV-8 Project & Building Log, Sandy's RV Aircraft Files

With our daughter, Sarah (3rd from left) at her senior art exhibit at Cal Baptists University in Riverside, CA. Click to enlarge
Was just getting seat back weldment about ready to install [preparing to remove the forward structure] and had a previous trip for my daughter’s senior art show in Los Angeles. Oh, well. Really good part is she graduates from college in a month!
She is a talented artist who actually wants to work in art museums in the curator area someday.
Once I get back I’ll get the WD-808 bolted on for extra support laterally and just as an extra measure of rigidity, then off comes the bottom skins, side skins and the two bottom aluminum angle pieces. That’ll take all of ten minutes.
Then I’ll just need to drill the angles to match the skins and “get’r done”.
Patience may be a virtue, but it’s hard to be virtuous being so close yet so far.
Videos will start flowing during this phase.
Download the latest full newsletters here OR individual articles below